2015May core #108 - Add constraint around Locked Date wrt referenced versions

XMLWordPrintableJSON

    • Type: Change Request
    • Resolution: Persuasive with Modification
    • Priority: Medium
    • FHIR Core (FHIR)
    • DSTU1 [deprecated]
    • Terminology Infrastructure
    • ValueSet
    • 6.21.4.2
    • Hide

      add note that if you use versioned references with a locked date, the versions need to be available that date

      Show
      add note that if you use versioned references with a locked date, the versions need to be available that date
    • Grahame Grieve / Eric Haas: 4-0-0
    • Enhancement
    • Non-substantive
    • DSTU1 [deprecated]

      Comment:

      Suggest a constraint regarding use of Locked Date and then composing value sets with concepts from versions of underlying terminologies which are more recent than the locked date.

            Assignee:
            Unassigned
            Reporter:
            gonatf
            Watchers:
            2 Start watching this issue

              Created:
              Updated:
              Resolved: